…and so it continues…

Well the fibre journey continues…

Back in January I wrote about how on the fibre journey, cabinet 25 in Weston Village had moved to the Design stage having spent years in the “we are exploring solutions” phase, which I actually believe means “it’s at the bottom of the pile of a large number of ‘solutions’ and we will get to it once we have had enough bad press, someone else starts laying cable or we have nothing better to do….”

Well as of the beginning of April we have moved along that fibre journey. We have entered the Field Survey.

Field Survey

We’ll now take the blueprints from the design stage to your community, and check that what looks good on paper works in the real world. Our surveyor needs to check that there’s enough space alongside all the existing utilities underground for our new cables, and whether there’s enough space to accommodate our equipment. We’ll also need to determine whether we’ll need to close any roads to install fibre and, if so, apply to the local authority for road traffic management, traffic lights etc… We’ll work closely with your local authority to make sure fibre is installed safely and with the minimum of disruption to local people.

This says we should have fibre in the next nine months which does make me wonder if BT are still hoping to have everything done by the end of June?

Nothing beats having a field survey of my own, and looking around that part of Weston Village where cabinet 25 lives, there doesn’t appear to be anything happening. No BT Openreach vans, no roadworks or cabinet installations. When other cabinets were upgraded, a new FTTC cabinet was put in place, usually just a few feet away.

So the story continues…

Will there be fibre?

Weston Village

So I recently contacted BT Openreach about Cabinet 25 in Weston Village and asked for an explanation of why it hadn’t being upgraded to fibre and why the original date of March 2017 was now delayed? I specifically asked them for an explanation.

Their reply was

In response to your query regarding delay in providing fibre we would like to inform you that the cabinet is not fibre enabled yet, however, a project is ongoing to provide fibre to the cabinet.

The project is expected to be completed by the End of June, 2017, however, this date is subject to change as per the amount of work left.

Please keep an eye on our website from the End of June, 2017 for an update. It’s where we publish the very latest fibre coverage information and we update it daily. This is when we would estimate that you should be able to place your order, all being well.  

They are saying the end of June 2017…

Really…

Somehow, and for some obscure practical reason I think, it will be delayed a they say themselves

this date is subject to change as per the amount of work left.

As you can also see there was no explanation as requested.

Hopefully not too long now….

Mobile phones, will they catch on?

I do wonder if the concept of a mobile phone would ever catch on….

From 13th September 1979…

Michael Rodd makes a call with an experimental cordless mobile phone.
It’s 1979 and time for the telephone to go mobile. In this report from a longer programme, Michael Rodd examines a British prototype for a cordless telephone that allows the user to make calls from anywhere. Also included at the end of this item is a rather nice out-take as Rodd also experiences the first mobile wrong number.

I do recall watching this when it was broadcast.

Of course we don’t really use our phones as phones these days, the mini computer we have in our pockets is now used for way more than just making calls.

Time to replace the ink

Back in July I posted about my new(ish) printer, in which I wrote:

…by posting this post I hope to have some kind of record of how long the cartridges last.

Well I now need to replace one of the replacement cartridges.

The first setup cartridge to run out was the double sized black cartridge which is used for black and white output. This lasted from the end of March to the beginning of July, just over three months.

The replacement XL version lasted from July to January and is still going, so lasted over six months.

I have replaced all the cartridges over the last six months and it looks like the XL cartridges are on target to last as long as the XL black cartridge.

We will have fibre in “12 months”!

Though to be honest I will believe it when I see it!

Those who have been following my FTTC fibre journey will know that I was one of the first people in my area to get fibre back in October 2010.  I was impressed with the 40Mb download speeds.

Really fast…

I was less impressed when I moved house in 2012 and having moved (literally) just down the street I was back on really slow ADSL. So for nearly the last five years I have had an ADSL connection that struggles to get to 1.5Mb download speed!

The story of the fibre journey of cabinet 25 connected to the Worle Exchange has been one of mis-information and downright confusion.

Back in 2015 I outlined the story so far…

Still no fibre

I have written previously about my woes with fibre before, when we first moved house and lost fibre and then my initial investigations into why I couldn’t get FTTC and back in 2012 writing about the confirmation of no plans to upgrading cabinet 25.

It would appear that BT Openreach decided initially that cabinet 25 wasn’t commercially viable, as a result passed it over to Connecting Devon and Somerset. Then at some point BT Openreach changed their mind about the commercial viability, so when Connecting Devon and Somerset came to plan to upgrade the cabinet, they found it was part of a commercial plan, and under the rules they adhere to, they weren’t able to upgrade it. Now we are in a situation where BT Openreach are saying that it is under review with no indication of when or even if it will be ever upgraded.

In May 2016 there was an article on the local paper.

Well, that’s a surprise…

According to the report in the local Weston Mercury, BT Openreach had changed their mind and would be upgrading cabinet 25 to fibre so that we can get FTTC.

In theory we were supposed to be getting fibre by March 2017… then it all fell apart and BT Openreach backtracked on the date!

So last week when I checked the BT Openreach linechcker I was surprised to see that the fibre journey which had been stuck on “We are exploring solutions” for years had moved along to “Design”.

According to the BT Openreach website this means

You’re in a fibre plan and we’re looking at the existing network in your area to see how we will design the upgrade. You can’t order a fibre service today but typically it’ll be available to your premises within the next 12 months.

So we could be connected to fibre in less than 12 months!

We’re drawing up our network plans and assessing the best way to bring fibre to your area. We currently deliver fibre to you in two ways. Sometimes we use a combination of fibre and your existing copper line to deliver our Superfast network (Fibre to the Cabinet). At other times we connect fibre directly to your property (Fibre to the Premises). We often need permission from the local authority while also considering the wishes of your community in terms of look and practicality. At the end of this design process, we’ll have a blueprint in place for delivering fibre to your community.

Possibly we might even get FTTP (fibre to the premises) but I think I am just blue sky thinking there!